Hydel Projects


  List of Hydro Power Projects in SIKKIM

Sl. No

Capacity (MW) and Name of Project

Implementing Agency / Project Developer

           Office Address

Location

Whether joint venture

Year of Commissioning

Free Power Share         ( In MW)

Purchase    ( In MW)

Remarks

1.

60 MW Rangit-III HEP

NHPC Ltd.

NHPC Rangit IV HEP, Rangit Nagar, Legship, Soreng District.

Contact No: 7042367567

Hingdam,

Soreng District

Central Public Sector Unit (CPSU)

15.2.2000

 12% of the delivered energy (Net generation)

1.33% of the delivered energy (Net generation)

Operational

2

510 MW Teesta-V HEP

NHPC Ltd.

NHPC Teesta V HEP, Balutar, Singtam, Gangtok District.

Contact No : 9932027172

Balutar,

Gangtok Sikkim

Central Public Sector Unit (CPSU)

April 2008

 12% of the delivered energy(Net generation

 

 

1.19% of the delivered energy(Net generation

Non-operational since 4th Oct2023due to flash flood. Repair and Restoration under progress. Tentatively operational by APRIL 2025

3

1200MW Teesta III

Sikkim Urja Limited

Teesta III HEP, near Manan Bhawan, Gangtok.

Contact No : 9733339475

Singkik,

Mangan District

Joint Venture

Feb 2017

 

        -

 

 

-

 

 

-

Non-operational since 4th Oct2023due to flash flood. No restoration work commenced as on date

4

110 MW Chuzachen HEP

Gati Infrastructure Ltd.

Chuzachen HEP, Development Area, Near TNSS School, Gangtok.

Contact No : 9800062416

Chujachen,

Pakyong Sikkim

Private

June 2013

12%+2%. of the delivered energy (Net generation

 

-

Operational

5

96 MW Jorethang Loop

DANS Energy Pvt. Ltd.

Lama Building, Opposite AG Quarter, Upper Syari, Gangtok.

Contact No : 9593882227

Majitar,

Namchi Sikkim

Private

Sep 2015

 

12% of the delivered energy(Net generation

 

-

 

Operational

6

97 MW Tashiding HEP

Shiga Energy Pvt. Ltd.

Lama Building, Opposite AG Quarter, Upper Syari , Gangtok

Contact No : 9593882227

Tashiding,

Gyalsing Sikkim

Private

Oct 2017

12%+1%(Local Area of the delivered energy(Net generation Dev)

 

-

 

Operational

7

113 MW Rongnichu HEP

Madhya Bharat Power Corp. Ltd.

Madhya Bharat Power Corporation Limited, Sawney Khola,Kumrek, Power House, Rangpo.

Contact No: 9474527338

Kumrek,

Pakyong District

Private

June 2021

3% of the delivered energy(Net generation

 

 

Operational

8

96 MW Dikchu HEP

Sneha Kinetic Power Projects Ltd.

Sonam Complex, Development Area, Gangtok.

Contact No : 7872444222

Dikchu,

 Gangtok District

Private

April 2017

12% of the delivered energy(Net generation

 

 

         -

Non-operational since 4th Oct. 23 due to flash flood. Repair and restoration work under progress. Tentatively operational by Nov 24

9

3 MW Lachung Stage II Hydel Project

Sikkim Power Development Power Corporation Limited ((SPDCL)

SPDC Limited, Near UD&HD Office, Gangtok.

Contact No : 7908190863

Lachung,

Mangan District

SPDCL

Jan 2009

 

 

No Free Power

Generated Power purchased by Power Dept.

Operational but in isolation mode.

10

2 MW Mangley Hydel Project

Sikkim Power Development Power Corporation Limited (SPDCL)

SPDC Limited, Near UD&HD Office, Gangtok.

Contact No : 7908190863

Mangley,

Namchi District

SPDCL

July 2008

 

 

No Free Power

Generated Power purchased by Power Dept.

Stalled. Intake washed away due to recent flashflood

11

5 MW Rongli Hydel Project

Sikkim Power Development Power Corporation Limited (SPDCL)

SPDC Limited, Near UD&HD Office, Gangtok.

Contact No : 7908190863

Rongli,

Pakyong District

SPDCL

Oct 2013

 

 

No Free Power

Generated Power purchased by Power Dept.

Operational

12

3 MW Chatten Hydel Project

Sikkim Power Development Power Corporation Limited

SPDC Limited, Near UD&HD Office, Gangtok.

Contact No : 7908190863

Lachen,

Mangan District

SPDCL

Sep 2022

 

 

No Free Power

Generating Power purchased by Power Dept.

Operational in isolation mode.

13

12 MW Lower Lagyap Hydel Project

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited, Lower lagyap, Power house HEP, Jalipool, Gangtok District.

Contact No: 9311300410

Lagyap,

Pakyong District

 

Leased to M/S Kundan Hydro (Gangtok) Private Limited as technical partner on renovate Operate Maintain &Transfer (ROMT) for a period of 35 Years.

After repair & renovation the project was made operational in May 2023.18MW capacity enhancement is achieved.

 

12% of the delivered energy(Net generation

 

Operational

14

4 MW Meyong chu Hydel Project

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited, Lower lagyap, Power House HEP, Jalipool, Gangtok District.

Contact No: 9311300410

Meyong,

Mangan District

 

 

 

 

 

 

 

 

 

--do--

After repair & renovation the project was made operational in May 2023.At present 5 MW is in generation after capacity enhancement

12% of the delivered energy(Net generation

 

Operational

 

15

3 MW Rabom chu Hydel Project

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited, Lower lagyap, Power house HEP, Jalipool, Gangtok District.

Contact No: 9311300410

Rabom,

Mangan District

             --do---

After repair & renovation the project was made operational in June 2022. At present 10MW is in generation after capacity enhancement.

12% of the delivered energy(Net generation

 

NO generation as evacuation network completely washed away due to 4th OCT 2023 flashflood.

 

 

16

 

2 MW KalezKhola Hydel Project

 

M/S Kundan Hydro (Gangtok) Private Limited

 

M/S Kundan Hydro (Gangtok) Private Limited,Lowerlagyap,Power house HEP,Jalipool,Gangtok District.

Contact No: 9311300410

 

Kalez,

Gyalsing district

 

--do--

 

After repair & renovation the project was made operational on May 2023. At present 5 MW is in generation after capacity enhancement.

 

12% of the delivered energy(Net generation

 

 

Operation.

17

0.6 MW Rimbi Stage I Hydel Project

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited,Lowerlagyap,Power house HEP,Jalipool,GangtokDistrict.

Contact No: 9311300410

Rimbi,

Gylasing District

--do---

 

12% of the delivered energy(Net generation

 

Under Examination

18

2.1 MW Jali Power House

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited,Lowerlagyap,Power house HEP,Jalipool,Gangtok District.

Contact No: 9311300410

Jali HEP,

Gangtok District

--do--

 

12% of the delivered energy(Net generation

 

Under Examination

19

2.5 MW Rongnichu Hydel Project

M/S Kundan Hydro (Gangtok) Private Limited

M/S Kundan Hydro (Gangtok) Private Limited,Lowerlagyap,Power house HEP,Jalipool,Gangtok District.

Contact No: 9311300410

            Topa, Gangtok District

--do---

 

12% of the delivered energy(Net generation

 

Under Examination

 

 

 

 

20

8 MW Upper Rongnichu

Rongni Chu Hydro Power Limited (RHPPL)

Upper Rongnichu HEP, Nimtar, Gangtok District.737135.

ConatcNo : +91-124-4037610,+91-370-2242484/85
 

 

URHP, (36 mile)

Gangtok District

Leased to M/S Rongni Chu Hydro Power Limited (RHPPL) for a period of 35 Years.

After repair & renovation the project was made operational in Dec 2021.

 

 

 

At present not operational because of no discharge

Status of ongoing Projects above 25 MW capacity:

Sl. No.

Name of Project and Capacity

Location

Implementing Agency / Project Developer

Remarks

1.

500 MW Teesta Stage-VI

Namchi District

Lanco Teesta Hydro Project Pvt. Ltd. (NHPC).

NHPC has acquired the project through NCLT during 2019. Works restarted. Expected CoD 2026.

2.

300 MW Panan HEP

Mangan district

Himagiri Hydro Energy Pvt. Ltd.

Construction works was delayed due to objection from National Wild Life Board. Now clearance has been obtained. CoD extended till Sept 2025. Progress is stalled due to funding issues; the developer is exploring possibilities with lending Agencies. 

3.

66 MW Rangit-II HEP

Gyalshing district

Sikkim Hydro Ventures Ltd.

Project was at NCLT. Recently the issue has been settled with the Debtor and CIRP has been withdrawn from NCLT on June, 2022. Developer is initiating the resumption of work. 

4.

120 MW Rangit-IV HEP

Soreng district

Jal Power Corporation Ltd. (NHPC).

Project acquired by NHPC through NCLT during 2020. Works restarted. Expected CoD 2025.

5.

51 MW Bhasmey HE

Pakyong district

Gati Infrastructure Ltd.

Project works suspended due to funding issues. Matter is admitted to NCLT

 

6.

520 MW Teesta Stage-IV

Namchi district

NHPC Ltd.

Project works is stalled due to public opposition. Forest Clearance Stage – II is awaited. Process for public hearing under Forest Rights Act 2006 is under process. District Administration and Forest Department has been requested for early action to complete public hearing in remaining three GPUs. 

7

12 Relli Chu HEP

Gyalshing District

M/S Kundan Hydro Power Limited

Work in progress. TentativeCoD 2026-27.

8

126 MW Rolep,Ralang and Chakungchu HEP

Rolep ( Pakyong district) Ralang(Namchi) &Chakungchu (Managan district)

M/S Kundan Hydro Power Limited

LOI issued.IA (implementation Agreement) yet to be signed.

9

10 MW New Meyong Chu HEP

Mangan district

M/S Kundan Hydro Power Limited

Work Stalled due to landslide.

10

6.6 MW Lower Meyong Chu HEP

Mangan district

M/S Kundan Hydro Power  LimitedLimited

Work Stalled because of forest land diversion issue.

UNDER CONSTRUCTION HEP

List of Projects sanctioned till date for development by IPP.

Sl. No.

Name of Project and Capacity

Location

Implementing Agency / Project Developer

1.

60 MW Rangit-III HEP

Hingdam, South Sikkim

NHPC Ltd.

2.

36 MW Rolep HEP

Rolep, East Sikkim

Amalgamated Trans Power (India) Ltd. (ATPIL).

3.

40 MW Ralang HEP

Ralang, South Sikkim

Amalgamated Trans Power (India) Ltd. (ATPIL).

4.

50 MW Chakungchu HE

Chakhangchu, North Sikkim

Amalgamated Trans Power (India) Ltd. (ATPIL).

3.

510 MW Teesta-V HEP

Balutar, East Sikkim

NHPC Ltd.

5.

110 MW Chuzachen HEP

Chujachen, East Sikkim

Gati Infrastructure Ltd.

6.

96 MW Jorethang Loop

Majitar, South Sikkim

DANS Energy Pvt. Ltd.

7.

97 MW Tashiding HEP

Tashiding, West Sikkim

Shiga Energy Pvt. Ltd.

8.

113 MW Rongnichu HEP

Kumrek, East Sikkim.

Madhya Bharat Power Corp. Ltd.

9.

500 MW Teesta Stage-VI

South Sikkim

Lanco Energy Pvt. Ltd.

10.

96 MW Dikchu HEP

Dikchu, East Sikkim.

Sneha Kitetic Power Projects Ltd.

11.

330 MW Teesta Stage-II

Lachen, North Sikkim

Him Urja Infra Pvt. Ltd.

12.

520 MW Teesta Stage-IV

Dzongu, North Sikkim

NHPC Ltd.

13.

300 MW Panan HEP

Dzongu, North Sikkim

Himagiri Hydro Energy Pvt. Ltd.

14.

66 MW Rangit-II HEP

West Sikkim

Sikkim Hydro Ventures Ltd.

15.

120 MW Rangit-IV HEP

Rothak,
West Sikkim

Jal Power Corporation Ltd.

16.

27.5 MW KalezKhola-I HEP

West Sikkim

Cosmic Infra Powergen Pvt. Ltd.

17.

54 MW KalezKhola-II HEP

West Sikkim

Pentacle Power Pvt. Ltd..

18.

25 MW Rahi Khong HEP

Dzongu, North Sikkim

Sikkim Engineering Pvt. Ltd.

19.

30 MW Upper Rolep (Changuchu)

Rolep, East Sikkim

Cosmic Infra Powergen Pvt. Ltd.

20.

30 MW Upper Rolep (Nathangchu)

Rolep, East Sikkim

Cosmic Infra Powergen Pvt. Ltd.

21.

99 MW Lachung HEP

Lachung, North Sikkim

Lachung Power Pvt. Ltd.

22.

99 MW Bhimkyong HEP

Bhimkyong, North

Teesta Power Pvt. Ltd.

23.

99 MW Bop HEP

Chungthang, North Sikkim

Chungthang Hydro Power Pvt. Ltd.

24.

99 MW Ting-Ting HEP

West Sikkim

T.T. Energy Pvt. Ltd.

25.

96 MW Lethang HEP

West Sikkim

KHC-Lethang Hydro Project Pvt. Ltd.

26.

40 MW Suntaleytar HEP

Suntaleytar, East Sikkim

Moses Baer Electric Power Limited

27.

26 MW Rechu-Meyongchu HEP

Rechu, North Sikkim

Planet Infra Projects Pvt. Ltd.

28.

51 MW Bhasmey HE

East Sikkim

Gati Infrastructure Ltd.

29.

71 MW Sada Mangder

South Sikkim

Gati Infrastructure Ltd.

 LIST OF HEP IN THE STATE OF SIKKIM

Projects commissioned under CPSUs, Joint Venture and IPPs.  

Sl. No.

Name of Project and Capacity

Location

Implementing Agency / Project Developer

Date of commissioning

Contact No

 

 

Under CPSUs:

 

 

1.

60 MW Rangit-III HEP

Hingdam, South Sikkim

NHPC Ltd.

Project commissioned in 15.2.2000 and is operational

7042367567

2.

510 MW Teesta-V HEP

Balutar, East Sikkim

NHPC Ltd.

Project commissioned in April, 2008 and is operational

9958043360

 

Total – 570 MW

 

 

 

 

 

 

Under Joint Venture:

 

 

1.

1200 MW Teesta State-III

North Sikkim

Teesta Urja Limited

Project commissioned in 28.02.2017 and is operational.

7719379095

 

Total – 1200 MW

 

 

 

 

 

 

Under IPPs:

 

 

 

 

 

1.

96 MW Dikchu HEP

Dikchu, North Sikkim

Sneha Kinetic Power Project Ltd.

Project commissioned in 31.4.2017 and is operational

9733310947

2.

110 MW Chuzachen HEP

Chujachen, East Sikkim

Gati Infrastructure Ltd.

Project commissioned in 18.06.2013 and is operational

9800062416

3.

96 MW Jorethang Loop

Majitar, South Sikkim

DANS Energy Pvt. Ltd.

Project commissioned in 25.09.2015 and is operational

9593882227

4.

97 MW Tashiding HEP

Tashiding, West Sikkim

Shiga Energy Pvt. Ltd.

Project commissioned in 18.10.2017 and is operational

9593882227

5.

113 MW Rongnichu HEP

Kumrek, East Sikkim.

Madhya Bharat Power Corp. Ltd.

Project commissioned in June 2021.

9752090024

 

Total – 512 MW

 

 

 

 

The power houses under the department that are now leased out to Kundan Hydro (Gangtok) Private Limited (formerly Hanuman

Ganga Hydroelectric Projects), having its office at lower lagyap,Ranipool, Pakyong District on Renovate, Operate, Maintain and

Transfer (RMOT) basis for a period of 35 years.

Sl. No.

Name of Project

Capacity

 Contact no

Status

1

Lower Lagyap Hydel Project

2 x 6 MW

9311300410

Operational on May 2023

2

Meyong chu Hydel Project

2 x 2 MW

…do….

Operational on May 2022

3

Rabom chu Hydel Project

2 x 1.5 MW

…do….

Operational on June 2022

4

KalezKhola Hydel Project

2 x 1 MW

…do…

Operational on Nov 2022

5

Rimbi Stage I Hydel Project

3 x 200 kW

…do…

Under repair

6

Jali Power House

6 x 350 kW

..do..

Under repair

7

Rongnichu Hydel Project

5 x 500 kW

..do..

Under repair

Total Capacity -             26.1 MW

  List of Hydro Electric Projects that are not commissioned:

Sr. No.

Name of the Project and Capacity

Location

Implementing Agency/ Project Developer

Remarks

MoU terminated

1.

330 MW Teesta Stage-II Revised Capacity 150 MW

North Sikkim

Him Urja Infra Pvt. Ltd.

Due to non performance of the developer the project MoU/ IA has been  terminated on 20/09/2016.

2.

27.5 MW KalezKhola-I HEP

West Sikkim

Cosmic Infra Powergen Pvt. Ltd.

MoU/IA terminated on 24.09.2016 due to non performance of the developer.

3.

54 MW KalezKhola-II HEP

West Sikkim

Pentacle Power Pvt. Ltd..

MoU/IA terminated on 20.02.2017due to non performance of the developer.

4.

30 MW Upper Rolep (Changuchu)

Rolep, East Sikkim

Cosmic Infra Powergen Pvt. Ltd.

MoU/IA terminated on 24.09.2016 due to non performance of the developer.

5.

30 MW Upper Rolep (Nathangchu)

Rolep, East Sikkim

Cosmic Infra Powergen Pvt. Ltd.

MoU/IA terminated on 24.09.2016 due to non performance of the developer.

 

6.

99 MW Lachung HEP

Lachung, North Sikkim

Lachung Power Pvt. Ltd.

Project was terminated as milestones could not be achieved. DPR could not be prepared as survey & investigation of the project could not be carried out even after four years of signing of the MOU / IA due to local resistance. MOU / IA was terminated by the Govt. on June 2012. Termination order of the project was challenged by the developer in the High Court of Sikkim. As per the directives of the High Court new time lines has been given to the promoter for the development of these projects. DC (North) is coordinatingwith the local stake holders.

7.

99 MW Bhimkyong HEP

Bhimkyong, North Sikkim

Teesta Power Pvt. Ltd.

8.

99 MW Bop HEP

Chungthang, North Sikkim

Chungthang Hydro Power Pvt. Ltd.

9.

99 MW Ting-Ting HEP

West Sikkim

T.T. Energy Pvt. Ltd.

Implementation Agreement terminated taking into consideration the religious sentiments of the public of the area.

10.

96 MW Lethang HEP

West Sikkim

KHC-Lethang Hydro Project Pvt. Ltd.

Implementation Agreement terminated as the National Wild Life Board, Ministry of Environment & Forest, Govt. of India did not grant clearance.

11.

40 MW Suntaleytar HEP

Suntaleytar, East Sikkim

Moses Baer Electric Power Limited

Due to non performance of the developer the LoI has been terminated on 20.02.2017.

12.

26 MW Rechu-Meyongchu HEP

Rechu, North Sikkim

Planet Infra Projects Pvt. Ltd.

MoU / IA terminated on 20.09.2016 due to non performance of the developer.

13

71 MW Sada Mangder

South Sikkim

Gati Infrastructure Ltd.

MoU / IA terminated on 20.09.2016 due to non performance of the developer.

 

 

 

 

 

Not commenced/ commissioned due to various reasons:

14.

30 MW Bakchachu

Bakcha, North Sikkim

Samvijay Power & Allied Industries Ltd.

The matter was deliberated by High Power Hydro Committee and considering the importance of drinking water supply for Gangtok, the HPC directed that the development the project be kept in abeyance as of now.

 

15.

25 MW Ratey chu

Rateychu, North Sikkim

Gon Cacey Pvt. Ltd.

The matter was deliberated by High Power Hydro Committee and considering the importance of drinking water supply for Gangtok, the HPC directed that the development the project be kept in abeyance as of now.

16.

36 MW Rolep HEP

Rolep, East Sikkim

AmalgatedTranselectric (India) Power Ltd. (ATPIL).

M/s (ATPIL) was awarded these projects in 1999 to develop in self -financing mode. The mode of development was changed to BOOT mode in 2002. Arbitration proceedings was initiated by ATPIL in 2013. The arbitration proceedings was completed on 7.5.2017 and final award of the sole arbitrator was challenged in the Hon’ble Commercial Court, East District. The Hon’ble Commercial Court has set aside the award for compensation but has awarded the specific performance to the company which is challenged in the Hon’ble High Court of Sikkim. The High Court order of 7th Oct. 2021 has asked the Dept. to deposit the award money with the Court. GoS has filed an appeal in High Court and however the hearing is continuing. Next date is scheduled on 27th April 2022.

17.

40 MW Ralang HEP

Ralang, South Sikkim

AmalgatedTranselectric (India) Power Ltd. (ATPIL).

18.

50 MW Chakungchu HE

Chakhangchu, North Sikkim

AmalgatedTranselectric (India) Power Ltd. (ATPIL).

19.

25 MW Rahi Khong HEP

Dzongu, North Sikkim

Sikkim Engineering Pvt. Ltd.

Project under detail survey & investigation for finalization of project components for preparation of DPR Public hearing has been concluded by SPCB.

Projects  developed by Sikkim Power Development Corporation Limited (SPDCL),having

its office at NH 10,(near UDHD Building)Gangtok.

Sl. No.

Name of Project

Capacity

Remarks

Contact no

1

Lachung Stage II Hydel Project

2 x 1.5 MW=

3 MW

Commissioned on JAN 2009 and operational.

7908190863

2

Mangley Hydel Project

2 x 1 MW=

2 MW

Commissioned on JULY 2008 and operational.

….do….

3

Rongli Hydel Project

2 x 2.5 MW=

5 MW

Commissioned on OCT 2013 and operational.

….do…..

4

Chatten Hydel Project

2 x 1.5 MW=

3 MW

Commissioned on SEP 2022 and operational

….do….

          Total capacity -              13.0 MW